Hybrid, off-grid and on-grid inverters from 3 kW to 125 kW, matched to the grid code and battery chemistry at the destination.
Choose the family first
Hybrid
PV, battery and grid in one unit. Best for self-consumption, backup and markets with unstable grids.
Off-grid
Battery-first with generator input. Best for areas with no reliable grid or for mobile/telecom sites.
On-grid
PV-only grid-tied. Lowest cost per kW for rooftop and ground projects with a stable grid.
Typical selection by application
| Application | Typical size | Phase | Battery | What to confirm |
|---|---|---|---|---|
| Home backup | 3.6–6 kW | Single | 48 V lithium | Backup loads, transfer time, generator input |
| Large home / small shop | 8–15 kW | Three | 48 V or HV | Three-phase imbalance, parallel capability |
| Off-grid site | 5–10 kW | Single/Three | 48 V | Surge loads, generator size, charger current |
| Commercial rooftop | 20–50 kW | Three | Optional | Grid code, MPPT count, string voltage |
| Utility / large C&I | 100–125 kW | Three | Optional | Grid code, reactive power, communication |
Grid code is part of the product
The same inverter may need a different firmware and certificate for each country. We confirm the grid code before quoting.
| Market | What the inverter needs |
|---|---|
| Nigeria | IEC 62109; SONCAP / PVoC for the shipment |
| South Africa | NRS 097-2-1 listing / compliance for grid connection |
| Saudi Arabia | SASO and the utility grid-code requirements |
| UAE | DEWA / ADDC / SEWA registration depending on the emirate |
| Pakistan | IEC 62109; project approvals handled by the EPC |
| EU | CE plus EN 50549-1/-2; Germany VDE-AR-N 4105 |
Battery compatibility
48 V lithium
Most common for 3–15 kW hybrid systems. Confirm the CAN/RS485 protocol and the battery list supported by the inverter firmware.
High-voltage lithium
Used on larger three-phase systems. Confirm the voltage window, the BMS communication and the stack limits.
Lead-acid
Still used in some off-grid projects. Set the charge profile and equalization correctly; the inverter must support the voltage range.
Generator input
For off-grid and weak-grid sites. Confirm the generator size, the transfer logic and the charger current before ordering.
Inverter questions
Hybrid or on-grid: which one should I buy?
If the customer needs backup or self-consumption with a battery, choose hybrid. If the grid is stable and the project is purely export-to-grid, on-grid is cheaper and simpler. Off-grid is for sites with no reliable grid.
Can the inverter run without a battery?
Most hybrid inverters can run PV-only, but the backup function needs a battery. Confirm the model and the firmware; some models require a battery for island mode.
What is the difference between low-frequency and high-frequency off-grid inverters?
Low-frequency units have a transformer and usually handle surge loads better; high-frequency units are lighter and cheaper. For motors, pumps and compressors, check the surge rating rather than the continuous rating alone.
Can I parallel two inverters?
Some models support parallel operation for more power or three-phase output. Confirm the model, the parallel kit and the firmware; not every size supports it.
Which battery protocols are supported?
Common protocols include CAN and RS485 with manufacturer-specific maps. Send the battery model and we check the inverter compatibility list before quoting.
Do you provide the grid-code certificate?
Yes, for the models and markets where the factory holds it. The certificate must cover the exact model and firmware; a generic CE mark is not a grid-code approval.
Can the inverter take a generator?
Many off-grid and hybrid models can. Confirm the generator kVA, the input transfer and the charger current; an undersized generator will not carry the load and the charger at the same time.
What is the lead time?
Usually 25–40 days depending on the model and the factory. We confirm the date after the model and certificate are fixed.
Send your inverter requirement
Tell us the destination, phase, power, battery and grid code. We reply with the model route and certificate check.