Customs data puts Russia at the top of China’s circuit-breaker exports (HS 853620, 12.5% of the value). Western brands pulled out and Chinese brands filled the gap fast — this market now buys IEC-designed gear on EAC paperwork.
The paperwork, in the order that matters
| Requirement | Who does it | Notes |
|---|---|---|
| EAC Certificate of Conformity (TR CU 004/2011 + TR CU 037/2016) | Issued to an applicant located inside the EAEU | Circuit breakers need a CoC (not just a declaration). Series certificates need sample testing; batch certificates move faster. |
| GOST-adapted standards | Fixed by regulation | ГОСТ IEC 60898-1 for MCB, ГОСТ IEC 61008/61009 for RCCB/RCBO, ГОСТ IEC 60947 for industrial gear |
| EAC marking + Russian-language label | Factory applies, we verify from photos | Missing EAC mark on the housing = cargo held at the border |
| FDMC/registry entry check | You can verify online | Certificate number is checkable in the Eurasian registry — we give it to you before shipment |
We do not hold EAC certificates in our own name — the applicant must be an EAEU entity, which is almost always you or your broker. What we do: supply the tested, marked goods and the complete document set so your certificate path is short, and warn you when a requested model is outside the scope of an existing certificate.
Buying habits worth knowing
- C-curve preferred even where B would do — stock moves faster with C
- 2P+N and 1P+N modular devices common in residential boards
- 220/380 V marking still requested in older documentation; modern gear is 230/400 — we can supply both markings by series where the factory supports it
- MCCB with rotary handles and motorised mechanisms for industrial retrofit projects
- Payment routing is the real bottleneck, not the goods — we sort the banking question before producing your order, and we tell you honestly if a channel does not work for your region
Sea to St. Petersburg / Vladivostok or rail via the China–Europe lanes from Yiwu — we quote both with transit times.
Get a real quotation, not a brochure.
Send model or photo · quantity · destination country · grid (V / Hz / 1φ or 3φ) · required certificate. You get unit price, packing data (carton / pcs / GW / CBM), lead time and the certificate list in one message, within 24 hours.