Worldwide low-voltage export  ·  230/400 V · 400/480 V · 50 / 60 Hz — quoted to your grid
Quote in 24 h WhatsApp +8619397709554 Ningbo port · 180 km

Solar Product Certification

A logo is not a certificate. Check the holder, the model list and the standard before you quote.

3things to check: holder, model, standard
7verification steps
UN38.3battery transport
SONCAPpre-shipment scheme

Product and standard

ProductSafety / performanceTransport / system
ModulesIEC 61215-1/-2, IEC 61730-1/-2, IEC 61853IEC 61701 salt mist, IEC 62716 ammonia, IEC 62804 PID
InvertersIEC 62109-1/-2, IEC 62116, IEC 61000-6EN 50549, VDE-AR-N 4105, G99, UL 1741, AS/NZS 4777.2
BatteriesIEC 62619, IEC 62620, IEC 63056UN38.3, UN3480/3481, UL 1973, UL 9540, NFPA 855
BOSIEC 60947-2/-3, IEC 61643-11, IEC 60269DC voltage rating, enclosure IP, installation code

Country entry matrix

MarketModulesInvertersBatteries / notes
EUCE + IEC 61215/61730CE + EN 50549CE + EU 2023/1542 + UN38.3
UKUKCA + IECUKCA + G98/G99UKCA + UN38.3
USAUL 61730 / UL 1703UL 1741 SB + IEEE 1547UL 1973 + UL 9540 + NFPA 855
AustraliaCEC listing + AS/NZS 5033AS/NZS 4777.2AS/NZS 5139 installation
Saudi ArabiaSASO / IECEE CBSASO + grid approvalSASO + UN38.3
UAEESMADEWA / ADDC / SEWAESMA + UN38.3
South AfricaIECNRS 097-2-1UN38.3 + local installation
NigeriaSONCAP / PVoCSONCAP / PVoCSONCAP + UN38.3
KenyaPVoCPVoCPVoC + UN38.3
BrazilINMETROINMETROINMETRO + UN38.3
MexicoNOM + CFENOM + CFENOM + UN38.3
PakistanIECIECIEC + UN38.3

A guide, not a legal opinion. The exact route is confirmed per shipment with the factory certificate and the importer’s instructions.

What a complete document pack contains

  • Commercial invoice, packing list and bill of lading / air waybill
  • Certificate of origin (CO, Form E or Form A as applicable)
  • CE DoC issued by the manufacturer, plus the test report
  • Destination scheme certificate: SONCAP, PVoC, SASO, INMETRO, RETIE
  • Battery: UN38.3 report, MSDS, DG declaration, Class 9 labels and SoC statement
  • Module: IEC 61215/61730 certificate and the model list; warranty document
  • Inspection report and loading photos

Seven checks before you quote

  1. Is the certificate holder the actual manufacturer?
  2. Does the model list include the exact SKU and power bin?
  3. Is the certificate still valid, and not suspended?
  4. Is the issuing body one that the destination authority accepts?
  5. Can the CB report be converted to the national scheme, and at what cost?
  6. Do the report values match the datasheet?
  7. Is the DoC signed by the manufacturer, with the standard version and address?

Certification questions

Can HAZAM issue a CE DoC?

No. The DoC is issued by the manufacturer. We are the exporter and we pass through the manufacturer’s DoC and test report. We can check that the document matches the model you are buying.

Is a CE mark enough for a solar inverter?

No. A grid-tied inverter also needs the grid-code certificate for the destination. CE covers safety and EMC, not the local grid connection.

How do I verify a SONCAP certificate?

Check the certificate number with the issuing body and confirm that the model list covers the shipment. SONCAP is a pre-shipment scheme; it cannot be replaced by a generic test report at the port.

Do batteries always need UN38.3?

Yes for lithium batteries. You also need the MSDS and a forwarder that accepts Class 9 dangerous goods. Air transport has additional state-of-charge limits.

What if the certificate does not cover my model?

We do not quote it as certified. We either find a covered model or explain the gap so you can decide. A certificate for a similar model is not a certificate for your model.

Who is responsible for the installation compliance?

The installer and the local electrical authority. The product certificate covers the product; the installation code covers the site. Keep the two separate.

Send your destination and product

We will tell you which certificate route applies before you commit to the order.

Request a quote →
Telegram E-mail
RUAR