Short answer: an FOB quotation for electrical goods should let you rebuild the seller’s cost stack from the factory gate to the ship’s rail at a named port. That means separate lines for goods, export packing, inland haulage, export customs clearance, origin terminal charges, loading on board and documentation — with ocean freight, insurance and destination charges explicitly excluded. If the quote is one number called “FOB price”, you cannot compare it with another supplier’s, and you cannot tell which of the two is actually cheaper.
We are an independent trading company. We do not manufacture breakers, contactors or meters, and we are not an appointed distributor for any brand — which is exactly why a quotation from us should be readable line by line rather than compressed into a single figure.
What FOB obliges, in one paragraph
Under Incoterms 2020, Free On Board means the seller delivers the goods on board the vessel nominated by the buyer at the named port of shipment, and risk passes at that point. The seller handles export packing, inland transport to the port, export customs clearance and the cost of loading on board. The buyer arranges and pays ocean freight and insurance, handles import clearance and pays destination charges and duty.
Two consequences follow. First, the port name is part of the term: “FOB China” is not an Incoterm, it is an abbreviation that hides a cost difference between Ningbo, Shanghai and a river port several hundred kilometres inland. Second, FOB is a delivery point, not a price formula. Nothing in the term tells you what the seller chose to include in the number.
The lines that should appear in a proper breakdown
A quote you can audit has the structure below. Not every supplier will send it in this form, but every supplier can answer the questions it implies.
| Line | What it covers | Why the buyer should see it |
|---|---|---|
| Goods | Unit price at the factory, by ordering code and quantity tier | This is the only line that responds to negotiation on volume; everything else is pass-through |
| Export packing | Inner boxes, cartons, pallets, moisture protection, marks | Carton strength and pallet policy are where damage claims are won or lost |
| Inland haulage | Factory to the named port, including any container drayage | Explains why two factories quoting the same goods differ by a few percent |
| Export clearance | Customs declaration, licensing where applicable, inspection fees at origin | Some suppliers quietly exclude declaration costs and invoice them later |
| Origin terminal handling | Port or container yard charges before loading | The most common source of a surprise invoice after the deal is agreed |
| Loading on board | Stevedoring and stowage to the vessel | Formally the seller’s cost under FOB; confirm it is inside the number |
| Documentation | Bill of lading, packing list, commercial invoice, certificate of origin, any legalisation | Origin certificates and consular legalisation are real costs, not paperwork formalities |
| Certification and testing | Scheme certificates, per-shipment clearance, sample testing | Should be quoted as a separate, visible service, not buried in the unit price |
Excluded by definition, and worth writing into the quote so nobody argues later: ocean freight, marine insurance, destination terminal handling, import clearance, duty and taxes, and inland delivery beyond the destination port.
The three lines buyers forget
Origin terminal charges are the first. They are billed by the terminal or the carrier, they vary by port and by container type, and who pays them depends on the freight agreement rather than on the three letters FOB. A supplier who quotes FOB and then lets the carrier bill the charges to the consignee has quoted a number that is technically defensible and commercially misleading. Ask directly: are origin charges inside your FOB price, yes or no.
Documentation is the second. A certificate of origin is routine; consular legalisation, chamber certification and legalised commercial invoices are not, and they can consume both money and calendar time. If the destination requires a legalised invoice, that belongs in the quote as a line, with the cost of the service and who arranges it.
Certification and testing is the third, and for electrical goods it is the one that changes the shipping plan. A per-shipment clearance such as SONCAP, PVoC or a SABER shipment certificate is a recurring cost per consignment, not a one-off factory certificate, and it sits at origin — which means it is inside FOB scope in practice even though it is not in the Incoterm. Decide before the order whether it is included, and get the answer in writing.
FOB versus FCA, for containers
Incoterms 2020 recommends FCA rather than FOB for containerised cargo, and the reason is practical rather than pedantic. A container is normally handed over at a terminal or depot, days before the vessel loads it. Under FOB, delivery and risk pass only when the goods are on board, so the seller carries risk during a period when it no longer controls the cargo — and the seller often cannot obtain a clean on-board bill of lading until the container is loaded.
For breakers and switchgear shipped in cartons, this usually means the commercial conversation should start at FCA plus a named place. Many suppliers will still quote FOB because that is the term their freight forwarder is used to, which is fine as long as both sides understand where the risk actually transfers and who is paying the terminal.
If you are comparing an FOB quote with an FCA quote, convert both to the same delivery point before comparing. The comparison is only meaningful when the physical handover point is identical.
Seven questions that turn a price into a quotation
Ask these before you compare two suppliers. Each has a short answer that can be checked, which is the point.
| # | Question | Why it matters |
|---|---|---|
| 1 | Which named port, and is origin terminal handling included? | Two ports can differ enough to reorder a shortlist |
| 2 | What is the price validity period, and what happens at expiry? | Copper, plastics and freight move; a quote with no validity is not an offer |
| 3 | Which currency, and who bears the conversion and bank charges? | Bank charges on both ends are a real line item on small orders |
| 4 | What quantity does this price apply to, and what are the tiers? | A unit price without a quantity is a placeholder |
| 5 | What packaging is assumed — carton, pallet, container loading plan? | Packaging changes both cost and freight volume |
| 6 | Which certificates and per-shipment clearances are included? | Decides whether the landed cost you calculated is real |
| 7 | What are the payment terms, and does the price depend on them? | A price quoted for one payment structure is not valid for another |
Comparing two FOB quotes without being fooled
The safe method is to ask both suppliers for the same three things: an ex-works price per ordering code at a stated quantity, a separate schedule of local charges with the named port, and the list of excluded items. With those three, you can rebuild each offer on a common basis and see whether the gap sits in the goods, the local charges, or the assumptions.
In practice the goods line usually differs less than buyers expect. The spread tends to come from packaging specification, from whether certification costs are absorbed, and from the quantity tier each price was written for. That is why a quotation that states its assumptions is worth more than one that states a lower number: the first can be compared, the second can only be trusted.
Do the same exercise for the freight side before you commit, using the loading data rather than an estimate; our notes on carton CBM and container loading explain how carton dimensions turn into a container plan, and the FOB, CIF and DDP comparison covers what shifts when you hand the freight to the supplier instead.
For the commercial context around the price — payment structure, inspection, claims — the payment terms page and the pre-shipment inspection page are the two that most often change a buyer’s mind after the first quote. And if you are still shortlisting, the supplier checklist in how to choose an electrical supplier in China is the right filter to apply before asking anyone for a price at all.
FAQ
Does FOB include export customs clearance?
Yes. Under FOB the seller clears the goods for export and bears the cost of that declaration. Import clearance at destination belongs to the buyer. If a quote excludes export declaration costs, it is not an FOB price in the Incoterms sense.
Who pays origin terminal handling charges under FOB?
The Incoterm places the cost of loading on board with the seller, but terminal and carrier charges are billed according to the freight arrangement. That is why the answer belongs in the quotation rather than in an argument after shipment. Ask whether origin charges are included, and get a yes or no.
Is FOB suitable for container shipments?
It works, but Incoterms 2020 recommends FCA for containerised cargo, because the container is handed over before it is loaded and FOB keeps risk with the seller longer than the physical control justifies. Many suppliers still quote FOB out of habit; just be clear about where risk passes.
Should certification costs be inside the FOB price?
They should be visible either way. A factory certificate is usually absorbed into the goods; a per-shipment clearance is a recurring origin cost and is better quoted as its own line so both sides know what happens on the second shipment, not just the first.
Why do two FOB quotes for the same breaker differ so much?
Usually packaging specification, quantity tier, certification scope, or a different named port. Occasionally it is a different product under the same description. Rebuild both on a common basis — ex-works price, local charges, exclusions — and the difference usually explains itself.
Related: FOB vs CIF vs DDP · payment terms for electrical exports · carton CBM and loading · pre-shipment inspection · choosing a supplier in China · sample order process · contact