Electrical Sample Order Process: Six Steps | HAZAM

November 14, 2026 · 7 min read

Short answer: a sample order is not a small version of a bulk order — it is the document that defines what “correct” means for every unit that follows. The process has six steps: a written sample request tied to one exact ordering code, a sample invoice that separates goods from freight, a golden sample sealed and retained by both sides, your own incoming tests, an optional third-party test, and a production specification the supplier signs. Skip any one of the six and the sample proves nothing you can use in an argument later.

We are an independent trading company. We do not manufacture circuit breakers, contactors or meters, and we are not an appointed distributor for any brand. That distinction matters more at sample stage than anywhere else: we can obtain the exact ordering code and the paperwork that goes with it, but we cannot change a mould, a tolerance or a trip curve — only the factory can, and the sample is how you find out whether they will.

Why the sample is a paperwork exercise, not a shopping step

A unit that arrives in a plain box with no code, no date code and no document is a gift, not a reference. What makes a sample useful is traceability: which ordering code it is, which production run it came from, which certificate file covers that code, and what the nameplate is supposed to say. A sample with all four is a contract annex. A sample without them is an object you will be comparing against your memory in eight months.

The single most expensive failure in this process is not a bad sample — it is a good sample that was assembled by an engineer rather than pulled from a production run. That sample will pass everything you throw at it and tell you nothing about the batch you are about to buy.

Step 1 — write the sample request as a specification

A request that says “please send one MCB sample” will get you whatever is nearest the door. Write the fields below, and insist the reply repeats them back.

Field What to write Why it decides the outcome
Ordering code Full code: frame, rating, curve, poles, coil voltage, auxiliary contacts “C16 3P” is not a code. The suffix set is what the certificate’s model list actually covers
Standard IEC/EN 60898-1 for MCBs, 61009-1 for RCBOs, 61008-1 for RCCBs, 60947-2 for MCCBs, 60947-4-1 for contactors It sets the test schedule and tells the factory which file to show you
Grid Voltage, frequency, single or three phase Breakers are calibrated for 50/60 Hz; contactor and relay coils are frequency-specific parts. A 60 Hz market is a coil and calibration question, not a different product family
Destination Country plus the scheme that applies (SONCAP, SASO/SABER, INMETRO, BIS, NOM, EAC, G-Mark, NRCS) Determines whether the sample must come from certified production and who should be the certificate applicant
Marking Nameplate content, language, terminal marking, packaging marks Marking errors are the most common reason a compliant product fails at the border
Quantity Enough to test one to failure and keep one sealed Destructive tests consume units; the sealed one is the reference
Measurements Anything you intend to check: module width, terminal torque, DIN rail fit, contact resistance Agreeing the checks in advance stops “that is within our normal tolerance” later

Step 2 — ask for a sample invoice, not a price

A sample invoice should have three separate lines: the goods, the freight, and any setup or tooling charge. Collapsing them into one number hides which of the three you are actually being charged for, and it hides it in the direction that suits the seller.

Ask two questions in writing before paying. First, is the sample charge credited against the first production order, and against what quantity. Second, who is the consignee and who clears customs at destination. On small parcels the air freight frequently exceeds the goods value, and a supplier who inflates the freight line to make the unit look free is telling you something about how the production invoice will be built. A sample declared at a token value to reduce duty is not a favour — the undervaluation becomes your compliance problem, not theirs.

Step 3 — agree and seal the golden sample

Once you approve a unit, stop calling it a sample. It becomes the golden sample: sealed, labelled with the ordering code, the production date and a revision number, photographed on the nameplate, the terminals, the marking and the packaging, with one copy held by each side. Every later dispute — colour, marking, terminal style, packing quantity per carton — is settled by opening it, not by remembering it.

Two conditions make it binding rather than decorative. It must be drawn from a production run, and the purchase order must reference it by revision number. Without the second condition you have a nice object and no contractual hook.

Step 4 — test what you can in-house

Most of the failures that reach a buyer are visible with a bench supply, a multimeter, a torque driver and a set of gauges. You do not need a laboratory to catch them.

Check How What it catches
Nameplate against order Read every field, including the code suffix Wrong rating or wrong curve shipped under a right-looking label
Mechanical fit Clip to DIN rail, measure module width, check terminal screw thread, apply the datasheet torque Housing or tooling drift, undersized terminals, brittle plastic
Insulation resistance 500 V DC between poles, and between live parts and the mounting surface Moisture, contamination, flash-over paths
Magnetic trip band Confirm the instantaneous trip falls in the curve window: B 3–5×In, C 5–10×In, D 10–20×In per IEC/EN 60898-1 A C-curve body sold as D, or a mislabelled rating
Residual current Test button, then residual current trip at the rated IΔn Seized mechanism, wrong sensitivity, DC-sensitive types mis-supplied
Contactor operation Coil pick-up and drop-out inside 85–110% of rated coil voltage per the datasheet; contact resistance across poles Coil voltage mismatch for the market, contaminated contacts
Meter behaviour Compare registration against a reference load; verify CT ratio on CT-operated models Wiring configuration, ratio, pulse constant errors

Step 5 — use a third-party test when it earns its cost

Three situations justify it: the destination requires a certificate you cannot verify yourself; the product is safety-critical in a way that a bench test cannot reach, as with residual current devices; or the order value is large enough that the test fee is a rounding error against the risk. Choose a laboratory accredited for that specific standard, and give it the ordering code — a report on “a sample of MCB” with no code on it is not evidence about your product.

Pre-shipment inspection is a different instrument: it samples the production run rather than the reference unit. See pre-shipment inspection for electrical goods for how the two fit together.

Step 6 — turn the approval into a production specification

Approval that lives only in an email thread evaporates. Assemble a small document set and make the purchase order reference it: the golden sample photo sheet with its revision number, the ordering code list, the certificate file whose model list contains those codes, the test report, the packaging specification including carton quantity and marks, the nameplate drawing, and the inspection plan. Six pages. They will save you a container.

What a sample cannot prove

A sample cannot prove process capability, consistency across a run, or that the certificate covers the code you ordered — those are three separate verifications. It also cannot prove the factory will still be making that code next year, which is why a change-notification clause belongs in the contract rather than in a conversation. What it can do is fix the definition of correct, early, while correction is still cheap.

FAQ

How many samples should I order?

Enough to test one to destruction and keep one sealed as the reference. The exact number depends on which tests you plan: an insulation and trip check is non-destructive, a thermal or short-circuit test is not. Decide the test list first, then the quantity follows.

Should I expect to pay for samples?

Yes, and that is normal. The useful questions are what the charge covers, whether it is credited against the production order, and who pays the freight and the destination charges. A “free” sample with an inflated freight line is not free.

Can the approved sample govern the whole contract?

Only if it is sealed, dated, revision-numbered, and referenced in the purchase order. Otherwise it is a shared memory, and shared memories diverge exactly when money is on the line.

What if the sample is good but the shipment is not?

That usually means the sample was hand-built or hand-selected. Ask for samples pulled from a production run, and add an inspection at the factory before shipment so the batch, not the reference unit, is what gets checked.

Does the sample come with a certificate?

Certificates attach to ordering codes, not to individual units. Ask for the certificate file whose model list contains your exact code, and then verify it in the issuing body’s own database — a PDF on its own proves nothing.

Related: pre-shipment inspection · payment terms for electrical exports · FOB vs CIF vs DDP · choosing a supplier in China · certification marks explained · carton CBM and loading · cross-reference · contact