Worldwide low-voltage export  ·  230/400 V · 400/480 V · 50 / 60 Hz — quoted to your grid
Quote in 24 h WhatsApp +8619397709554 Ningbo port · 180 km
Technology

Panel Labelling to IEC 81346: What an Export Drawing Must Agree On

November 3, 2026 · 9 min read

Short answer: IEC 81346 is a naming convention, not a drawing style. It gives every item in a panel three reference designations — one for the function it performs (prefix =), one for the physical product (prefix -), one for where it sits (prefix +) — and part 2 supplies letter codes for the class of device. An export panel passes inspection when three things agree: the designation on the drawing, the label on the device, and the marking on the wire and terminal it lands on. Most rejections at destination are not wrong codes; they are codes that stopped matching at the second revision of the drawing.

We are an independent trading company — not a manufacturer, and not an appointed distributor of any brand. What follows is the labelling discipline we apply when a buyer sends a panel drawing for review, and the questions we ask before a board is built.

Three aspects, three prefixes

The point of the standard is to separate what something does from what it is from where it is, so the same physical device can be referred to unambiguously in a drawing, a bill of materials, a wiring list and a maintenance procedure. The three aspects are conventionally written with three prefixes, and mixing them up is the single most common failure.

Prefix Aspect Answers the question Example
= Function What does this part of the installation do? =P01 main distribution, =M02 pump motor circuit
- Product Which physical device performs it? -Q1 incoming breaker, -K3 contactor, -F2 fuse
+ Location Where is it installed? +A1 first enclosure, +C2 cable route, +R1 control room

Read together, +A2=P01-Q1 says: in enclosure A2, in the main distribution function, the incoming protective device. That string is worth more than a paragraph of description because it survives translation, it sorts, and it can be searched in a maintenance database five years after the panel left the workshop.

The letter codes panels actually use

Part 2 of the standard assigns letters to device classes. The table below is the working set that appears in low-voltage distribution and motor-control panels — the codes a draughtsman will already expect when a drawing arrives from Europe.

Letter Class in a distribution or control panel Typical devices in our range
A Assembly, sub-assembly, group Distribution board, motor control centre section
B Transducer, sensor, measuring element Current transformer, voltage sensing relay input
F Protective device (overcurrent, surge, thermal) Fuse, SPD, thermal overload relay element
K Relay, contactor, signal-processing device Contactor, time relay, phase-failure relay, auxiliary relay
M Motor, actuator producing motion Motor, motor-operated valve
P Measuring, monitoring, indicating instrument Panel meter, ammeter, energy meter display
Q Power switching device (circuit making and breaking) MCB, MCCB, RCCB, RCBO, isolator, ATS
R Resistor, load, passive element Bleeder or heating resistor, terminating resistor
S Manual-operated switch, control device Push button, selector switch, limit switch
T Transformer, voltage conversion Control transformer, current transformer as a power device
W Cable, busbar, conductor run Incoming cable, busbar system, internal wiring run
X Terminal, connector, plug connection Terminal block, plug connector, interface point

Two notes on that table. First, K versus Q is the split that trips people up: a device whose primary job is switching load current is Q, a device whose job is processing a signal — even if it switches a contactor coil — is K. Second, a device gets one letter for its main class, not one per function. A motor protection circuit breaker is Q, not Q plus F; its overload function is described in the documentation, not encoded in a second letter.

The edition trap nobody warns you about

Part 2 of IEC 81346 was revised in 2019, and the revision reorganised the class letters into a two-letter scheme. Many project specifications, and almost every panel shop’s existing drawing template, still run on the single-letter codes shown above. Both can be correct — but only one of them applies to a given contract.

So the first question to the customer is not “which devices” but “which edition does your drawing standard reference, and may we see one page of an existing drawing?” A one-page sample answers more than a spec clause: it shows the prefix convention, the letter set, the terminal numbering style, the title block, and the language of the notes. Reproducing that house style costs almost nothing at the drawing stage and costs a rebuild after the inspecting engineer rejects the documentation.

Situation What usually breaks What to do before the panel is built
Customer supplies an old drawing set New devices labelled with current codes, old ones single-letter Pick one edition for the whole board and re-label the template, not just the new items
Two suppliers build two sections Different terminal numbering between sections Fix the numbering scheme in the interface drawing and make both builders sign it
Panel is a copy of a previous project Location codes still reference the old site’s rooms Re-issue + codes from the new site plan; never carry them over
Devices added during commissioning Hand-written labels that never reach the drawing As-built revision issued before shipment, with the added items properly designated

What has to be printed on the label

A device label has one job: let a technician standing in front of the panel find that device on the drawing without counting rows. That means the designation, and only the designation — the description belongs on the drawing, not taped to the breaker.

Item labelled Minimum content What a destination inspector checks
Device Reference designation, e.g. -Q12; rating marking on the device itself Label matches drawing; rating marking is the one ordered, per exact ordering code
Terminal Terminal block designation and terminal number, e.g. -X1:14 Numbering continuous and unique across the board; no duplicated terminal numbers
Cable Cable designation plus the designation of where the other end lands Both ends labelled; gland and cable size as per the cable schedule
Board / enclosure Location code, supply data, rated current, IP rating Voltage and frequency stated match the site supply; IP rating matches what was ordered
Warning points Dual supply, back-feed, stored energy, capacitor discharge Warning present at every point where isolation is not obvious
Inner door / cover Single-line diagram or pocket for the drawing Diagram inside the panel, current revision, same designations as the labels

Label durability matters more than label style. Adhesive paper labels fall off in a hot enclosure within a season; engraved traffolyte or printed polyester with a proper adhesive survives. If the destination is hot and humid, laminated labels on a cleaned surface, applied with roller pressure, outlast anything stuck on over dust.

Terminals, cores and cables: keep the three systems apart

The reference designation names the device. It does not name the wire. Wire and core identification is a separate discipline — the machinery electrical standard IEC 60204-1 sets out conductor identification practices that most European panels follow, and North American panels follow a different convention entirely. Keeping the two systems apart prevents the classic mess where a wire number happens to equal a device designation and a fitter spends an hour chasing the wrong terminal.

What we insist on in the drawing set, regardless of which convention the customer uses:

Every core has an identity at both ends, and the identity is the same at both ends. Every terminal has one number, not two. Every cable has a designation that appears in the cable schedule, and the schedule states type, core count, cross-section and the gland size that the enclosure actually needs. Where a conductor passes through a plug connector, the connector gets an X designation of its own — that is the whole reason the class exists, and it is what makes a panel serviceable when a section has to be unplugged and removed.

Language is part of the label

An English-only panel is fine in some markets and a customs or inspection problem in others. Several destinations require the marking and the accompanying documents in a national language: the Eurasian Economic Union expects Russian, the Gulf states and Egypt expect Arabic alongside English, most of Latin America expects Spanish, and Indonesia expects Indonesian. Nameplate and instruction-language requirements are set by the destination’s technical regulation, not by the buyer’s preference, so confirm them with the same rigour as the certificate question.

Practically, that means the label set is agreed before the panel is assembled — the designation stays in Latin characters and numerals, and the descriptive and warning text is bilingual or in the national language. Adding a second language to a label file after the panel is wired is an engraving job on a finished board, which is the worst time to discover it.

The documentation set that travels with the board

Labels only work if the paperwork behind them is complete and current. The set we ship with an export panel: single-line diagram, circuit diagrams with the same designations used on the labels, terminal and wiring list, cable schedule, bill of materials with the exact ordering codes, device manuals, and the certificates that apply to the models actually used. A drawing that is one revision behind the panel is not a documentation package; it is a defect with a printer attached.

This is also where a pre-shipment inspection earns its cost. The inspector compares label to drawing, drawing to device, device to certificate. Anything that disagrees gets written down, and whatever gets written down gets argued about at destination. Getting a second pair of eyes on that three-way match before the container is sealed is cheaper than getting the same finding three weeks later, in a language nobody in the workshop reads.

FAQ

Is IEC 81346 mandatory?
No. It is a convention, and it becomes mandatory only when a contract or a national standard references it. What is effectively mandatory is internal consistency: the drawing, the labels and the wiring list have to agree, and the destination inspector has to be able to follow them.

Do we have to use the prefix symbols?
Not always, but they remove ambiguity for free. If the customer’s house style uses plain numbers, follow the house style — the value of the standard is the discipline of one designation per item, not the punctuation.

What is the difference between Q and K designations?
Q is for devices whose primary purpose is making and breaking power circuit current: breakers, RCCBs, isolators, transfer switches. K is for relays and contactors in the control and switching chain. A contactor is K even though it switches a motor, because its class is signal-processing and switching in a control chain, not circuit protection.

Should the device rating be on the label?
No. The rating belongs on the device itself, as the manufacturer applied it, and in the bill of materials with the ordering code. A label carrying a rating that disagrees with the device is worse than no label.

How do we handle a panel that will be extended later?
Reserve designation ranges and terminal blocks now, and put the reserves on the drawing. Nothing derails a site extension faster than discovering that -Q14 through -Q20 were used for terminal blocks, or that -X3 was skipped and someone has since used it for a different function.

Who is responsible for the labelling — the panel builder or the buyer?
The buyer owns the drawing standard; the builder owns the execution. Our role sits in between: we translate the buyer’s drawing intent into a bill of materials with exactly specified ordering codes, and we check the labelling requirement before the panel is built rather than after it is crated.

Related: CE, UKCA, CB and EAC — what each mark proves · Which certificate does my country require · Planning enclosure size in DIN modules · Busbar current rating · Pre-shipment inspection for electrical goods · Boards and enclosures · Cross-reference an existing panel · Request a quotation

Need this checked against your order?

Send the model, quantity and destination — we reply with the correct code, certificate position and price within 24 hours.

Telegram E-mail
RUAR